Day 101Shell
We survey, strip and skim. You start with plaster, one window and a ceiling coffer.
One study in north London, filmed from bare plaster to lights on. Scroll to build it.
A 5.4 metre walnut credenza and two open shelving frames, scribed to the walls on site. Everything else in the room is measured off them.
Herringbone over an acoustic underlay, so the room below never hears your chair. Then a flat-woven wool rug, rolled out once the oil is dry.
A 2.4 metre walnut top on blackened steel frames, with a drawer pedestal hung either side. Built to your elbow height, not a catalogue's.
Your books, your lamp, a plant that likes a north window. We place them with you, and leave a third of every shelf empty on purpose.
A brass pendant over the desk and warm LED in the ceiling coffer and under every shelf, set once there is something worth lighting.
Most home offices are a desk pushed against whichever wall was free. We build the room around the work instead: joinery first, light last, and nothing in between that you did not ask for.
The order is the method. Each trade builds on a surface the last one finished, so nothing gets cut twice.
Day 1We survey, strip and skim. You start with plaster, one window and a ceiling coffer.
Days 2–8Credenza and shelving frames are made in our workshop and scribed to the walls on site.
Days 9–11Oak herringbone on acoustic underlay, oiled twice. The rug waits until the oil is dry.
Days 12–14Steel frames first, levelled to the floor, then the walnut top and two drawer pedestals.
Day 15Chosen after a sitting, not a brochure. We bring three to your old desk and you pick.
Days 16–21Your books go back in, plus what the shelves still need. A third of each shelf stays empty.
Days 22–24Pendant, coffer and shelf lighting on three dimmable circuits, commissioned last.
A short list, so every room ages the same way: darker, softer, and better for being used.

Every door, drawer and desk top comes from one batch of boards, so the grain and colour match across the room. Finished in hard wax oil you can refresh with a cloth.
Same room, same window, twenty-four working days apart. Drag across it to see what changed.
Day 24Day 01

I stopped working at the kitchen table on a Monday. Five weeks later I had a room with a door that shuts, and I have not opened my laptop in the kitchen since.Harriet Oyelaran, literary translator, Highbury

Tell us the size of the room and when you would like it. We measure, sketch and give you a fixed price and a fixed handover date. The visit is free inside the M25.